Saturday, August 4, 2012

Hiding the Hole, Part IV: Done!
















After a month or so of on-and-off work, the hole in the wall is hid. Now operators won't be able to see where the staging yard joins the layout; the trains "mysteriously" appear before their eyes.

There's still more work to do the right of the scene--got something unique planned for that. But now, at least, the upper level is more-or-less back together; now to tackle the lower level of the layout.

To re-cap the process of hiding the hole, see the photos below. Links to previous posts about hole hiding are at the bottom.

The hole.













The hole-hiding hill is added.













Ground foam added, and a bridge.











Background trees in place.













"Real" trees planted.












How the scene looks at operator eye-level.























Previous posts in this series:

Hiding the Hole Part III
Hiding the Hole Part II
Hiding the Hole Part I

1 comment:

  1. Nice work! CP6023 is presently working in Edmonton.

    ReplyDelete